Marta 5 Points Station – Emergency Response

Remediation Group was contracted to perform the removal of approximately 2,000 gallons of standing water from the sewage room within this marta station tunnel. We handled the extraction from two septic tanks and their associated drains lines as well. This emergency had to be delicately handled as it involved hazardous material in a very congested location at the time of the incident.